MARS DESERT RESEARCH STATION

Sol Summary – March 13th

MDRS Daily Summary Report for SOL 2

Person filling out Report: Michał Kazaniecki, Engineer

Summary Title: Last day of freedom

Mission Status: Final prepearation for SIM

Sol Activity Summary: reconnaissance outside the hab (and surrounding roads), fixing the tunnel, geological survey

Look Ahead Plan: first day in fully isolation (SIM)

Anomalies in work: solar panels still don’t work properly

Weather: sunny, calm, no strong wind

Crew Physical Status: minor injury while opening the can, but everyone is still alive and in good condition

Reports to be file:

-Operations report

-Commander report

-Mission Plan

-Bios and Photos

-Science report

Crew 175 – End of Mission Summary

Crew 175, the MDRS Supaero Crew is composed of six students and one young graduate from ISAE-Supaero, a leading French Aerospace Engineering school in France. Arthur Lillo and Louis Maller, former Crew 164 members gathered a team of people with complementary skills among the students of the school, most of whom had supported the MDRS 164 effort. Together, we worked on many and varied experiments in Technologies, Human Factors, Earth Sciences and Astronomy in the Mars Desert Research Station that we helped keep in a good shape. Many of the experiments we had prepared prior to coming to the station, and we also had many other tasks to carry out on site.

 

Our team:

Commander: Arthur Lillo

Executive Officer: Louis Maller

Engineer: Xavier Rixhon

Astronomer: Mouâdh Bouayad

Biologist:  Victoria Da-Poian

Journalist:  Louis Mangin

Health & Safety Officer: Simon Bouriat

 

Main Projects

Here is a list of the main projects we conducted at MDRS:

 

Solar Balloon

During the entire simulation, we used a balloon that just uses the difference of density of the air to fly. The sun’s rays heat the balloon and the air inside gets hotter than outside. It is a really simple technology with advantages like a very light mass, small volume and no external energy needed.

We took the balloon out four times. The first and third times were quite successful as the balloon flew perfectly. The second flight went really bad though the wind was only around 12km/h. The balloon tore apart and we immediately put it back in its box. For the last flight we changed the camera position and intended to leave the balloon out for 24 hours. We eventually removed the camera and later on, the platform broke and the balloon flew away.

Our main observation is that the balloon doesn’t resist the wind. We got some data and videos and can say that the balloon is a good idea. It can replace a drone to study the atmosphere. It could be used with spectrometer to study the ground, with water radars or even to calculate the dust amount in Mars’ atmosphere which could be important to plan EVAs.

 

Seismometer

The deployment of the Martian seismometer and acquisition system was quite laborious, because of the gloves and the spacesuit weight, which really reduces the precision of movement. The fog in the helmets also damages precision. Regarding data collection, we could do it without any problem.

However, the weather influenced the acquisition, because the sensor has moved several times, though slightly. We were unfortunately limited in the depth of our acquisition zone, because it was difficult to dig manually, especially with the spacesuit’s weight, which is an additional difficulty.

The data collected is coherent in terms of spectrum of the measures, which is quite satisfying. Further analysis would be needed, but the main goal of the experiment – deployment of the material by astronauts – was met with success.

 

Optinvent AR Glasses

This is the third Supaero crew to take with us the Optinvent glasses. This year we had the new ORA-2 version.

We were able to use movements of the glasses in order to take voice recordings and pictures.

Movement detection works, but there are few movements available, and a compromise must be found between the ease to trigger the action in the spacesuit, and the fact that it could be accidentally done.

We used the AirDroid App in order to monitor the glasses from inside the Hab, as long as they were in range of the Hab. We were able to see from inside what the astronaut was seeing, screenshot these pictures, and download files from the glasses. This was particularly useful for the engineering check results.

We failed to implement control of the glasses from a phone on the arm through Bluetooth, because of software problems. But this solution should be ready in the future, when we should be using in an optimized manner the different means of control (motion detection, touchscreen, vocal control, eye tracking).

All applications use Bluetooth or local networks, no need for an internet connection.

The new generation of glasses are lighter, easier to use, with good visibility and battery life.

As this technology matures, it will probably be implemented on actual EVA helmets, maybe as a heads-up display, but with significant resemblance to what we are doing with the glasses.

 

Navigation by Sextant

The sextant experiment conducted by Arthur was developed to help astronauts find their position, given that it is impossible to use a magnetic compass on Mars and there is not likely to be a GNSS constellation around the planet at the beginning of its manned exploration.

The material needed was a marine sextant, a color map, a notebook and pen. Arthur uses the sextant horizontally to measure two angles of sight between three reference points in the landscape. The position of the point must be known accurately on the map. After the measurement, Arthur notes the two angular values and the points associated on the notebook. Inside the Hab, using geometry, it is easy to find the position of the astronauts on the map.

We took the sextant during every EVA Arthur took part in. Doing measurements on the seismometer spot, we obtained precision of two to three meters, which is better than the usual 5-meter accuracy of the GPS. The most valuable lesson of this experiment is that the sextant was very ergonomic in the spacesuit: it has no lens so one can use it at 20 cm of his eye; the moving part is easy to handle with gloves and the angular dial is readable even through helmet fog.

The experiment was a success, since the sextant is handy in spacesuit and we were able to find our location afterward with a high accuracy. It seems possible for future Mars explorers to use this navigation method.

 

Aquapad – Water quality monitoring

This experiment provided us with an easy way to monitor the bacterial pollution of our drinking water. Water can stay for many days in our different tanks, thus bacteria can grow in there. The Aquapad system was developed by the CNES (French space agency) and is currently used aboard the ISS by French astronaut Thomas Pesquet. It is composed of spaceproof Petri dishes, syringes and a tablet application for picture analysis and recording.

At the beginning, we took three samples: tap water, water from the jug water filter and from the electric kettle. The bacteria grew on the agar media and showed up as red dots behind the sealed glass. We then took pictures of the bacterial colonies with the tablet and the application counted the red dots. Unsurprisingly, there was no difference between tap and filtered water (the jug water filter removes many common impurities but cannot cope with microbes). The Aquapad results were that the water could be considered healthy. The real difference was between these two waters and the boiled one: there was not one red dot in the third Petri dish, which proves that all the bacteria had been killed in the process.

When looking at the results of our study, it seems that the bacterial pollution remained roughly constant during the whole mission. It was a very simple and quick way to monitor such a critical matter, and could be generalized to non-space applications.

 

Vegidair – indoors Vegetable Garden

Victoria brought an autonomous vegetable garden created by a French start-up called Vegidair. She installed this Vegidair in the living room of the Hab so everyone could see it and our new vegetables. When we opened the Vegidair after the long trip from Earth to Mars, we discovered it was cracked. We fixed it with sealant. Victoria planted some lettuces and some roquettes. and decided to plant the same seeds, with the same fertilizer, in the same pots and put this in the GreenHab to compare the growth between a natural way and with the Vegidair system.  We really believe that it had a positive psychological effect on the team to see our fresh food growing in the Hab. Victoria is leaving her little Vegidair here for the next crews. and hopes they will take care of it and enjoy the fresh lettuces and roquettes it will produce.

 

Physical Training

Physical activities have been done through a particular training made with Cyril Vieu, responsible of the physical trainings at INSEP (Institut National du Sport, de l’Expertise et de la Performance) and with Frederic Bouriat, physiotherapist and member of the AKEF (Association des Kinésithérapeutes des Equipes de France). At the beginning, I was supposed to do this training alone but my crew kindly proposed to join me for the entire simulation.

The training is quite simple, made of three sessions each week composed by the same simple exercises. This activity had a very positive impact on the health of the crew each day. It forced us to wake up early and was a moment where everybody was together. To make the planning, I followed some rules I had set up before reaching the station, respecting rest days and taking EVAs into account. Everybody has progressed during the three weeks. Sunday of the second week was the only day we didn’t do the physical training because everybody was really tired and needed to rest.

This experiment has helped improve team building, maintain the physical health and it represented a fresh start each day. The program is really well made as it fits everyone despite the different physical capacities and moreover, it really allowed me to follow everybody’s performances. – Simon, HSO

 

Astrophotography

It took Mouadh some time to get used to the astronomy and astrophotography instruments, but he finally managed to take some great pictures of the sky. He believes the guides written by Peter are crystal clear. Unfortunately, the weather conditions were not favorable half of time, but he could make 8 observations in total, which is more than was expected. He discovered an entire universe, and now definitely wants to know more.

Objects viewed: Orion Nebulae, Betelgeuse, Jupiter (and moons), Sirius, Andromeda Galaxy, Saturn (and moons), Moon, Mars, Venus, Pleiades.

 

Journalist activities

As we had a “full-time journalist” this year, Louis Mangin, only one person managed every type of communication. We tried to focus on making daily journalist report as accessible and detailed as possible, written both in French and in English, with eye-catching pictures, to allow our relatives to share it easily, to gain notoriety, to spread through social medias and discussions. We received a lot of attention from French media. We also worked hard on a rotation video, which is not finished yet. We tried to build a wide quality photo bank, with panoramic views, aerial pictures from the balloon, to be able to reuse it for communication purposes for the year to come, also to gain interest from a wider public.

Emergency Procedures

Accidents happen in everyday life on Earth, and usually require assistance. This might be a simple sprain, a temporary fatigue or worse, a loss of consciousness. When these critical situations happen, the very first minutes after the incident can be lifesaving.

The same can naturally occur on Mars. The Sol 14 EVA (#13) was then dedicated to these procedures that can save lives. After a short briefing given by Simon and Xavier to our three buddies (Louis Maller, Mouâdh and Arthur) on the lower deck, we carried out the following exercises before the Hab: bringing the patient to sitting position, recovery position, on his back and finally carrying him on the rear of the Rover.

After taking photos and debriefing the different procedures, Xavier and Simon are currently writing an illustrated report summing up the results and the conclusions from this EVA.

 

NASA Human Factors Survey

During the simulation, we had a survey brought to us by Michigan State University and NASA. It was a personal survey each member filled in with questions about how we feel about our personal interactions within the crew, mission support and “Earth” but also about how we perceive ourselves.

This survey helped us reconsider what we did or how we felt each day. Each time, we did it in the evening, after dinner. It took us approximately thirty minutes each time and we needed to be really focused. Occasionally, some of us could not filled it, exhausted by a long and busy day.

We all think that this study will give a lot of data about how a crew like ours currently works. It could be very interesting as our crew is composed of people knowing each other well. The results will probably be far from more classic crews and might answer important questions about team strategies.

 

Other Tasks

Here are some of the other activities done in the Hab during the rotation:

 

GreenHab care

Victoria’s second goal was to take care of the GreenHab. Every day she went two or three times in the GreenHab tending to the plants. She noted the temperatures and the humidity rates in the tunnel and in the GreenHab. She watered twice a day and when she harvested a lettuce or some radishes she planted new ones. The next crews will have several nice lettuces in the Hab and in the GreenHab.

 

Backpack troubleshooting

When we arrived at MDRS, backpacks #2 and #3 weren’t working. Xavier took care of this and fixed them up. About #2, it was simply the ground wire of the charger connector (inside the backpack) which was loose and had to be reconnected. Concerning #3, the electrical joint linking the wire from the external switch and the one to the battery was broken. Therefore, the battery was fully charged but we weren’t able to switch it on. In the end, we had 6 working backpacks (out of 6).

 

3D printer troubleshooting

We intended to see if the 3D printer was up and running, in case we needed to print some spare parts for our different experiments or for the Hab. We found it in a sorry state. Some of the material was missing (USB flash card, quick start guide, spatula…). The plastic cartridge wasn’t operational. It was fixed, but some other issues remained:

– The printing head seems unable to melt the plastic correctly;

– The knobs supporting the printing plate are damaged, one of them is not usable for calibration anymore;

– The printing plate itself seems damaged, its surfaced scraped.

 

Radio Troubleshooting

When we arrived at MDRS, 6 talkies were functional out of 9. We fixed up the 2 first non-functional talkies at Sol 6 and ended up with 8 functional radios (out of 9).

We also tried to build a two-way radio relay system by using two talkies, on VOX on two different channels, but tests showed the limits of this system, which was too unstable.

 

Power system troubleshooting

Since the beginning of the simulation, we’ve been experiencing power being drained from the batteries when the generator was turned off.

At the end of the Sol 5 troubleshooting session, thinking that one of the two solar arrays circuit was open, we came up with the following strategy: while waiting for the solar arrays contractor to come over and try to fix this up, we’ll have kept the generator on in order to prevent batteries from being drained their power.

During two days of troubleshooting (Sol 9 and 10), the generator had been running (and keeping batteries 100% charged), setting the batteries voltage high enough and the sun had been pushing the solar panels to power the batteries at an even higher voltage. These 2 reasons naturally led to shut down two thirds of the PV arrays via the PT-100 Charge Controllers.

Finally, Xavier assumed that, since the PV arrays have been installed, they got through some mysterious “incidents” making them unable to hold up the batteries (even during full daylight). This forced the auto-start of the generator to turn it ON and made it run for a time period exceeding the “Max Run Time” (implemented in this generator controller). Since then, this auto-start has never worked again.

 

Engineering check document

Given the number of tasks to do and of data to collect during the pre-EVA engineering check, Xavier set up an EVA Engineering Check document. The final version of this Excel file, filled in by the HabCom of the corresponding EVA, is split in 5 sheets, containing instructions and a data synthesizing table:

  • Before: It allows to check that everything which will be used during the EVA is ready, and also aims to check EVA participants are correctly and safely geared up.
  • Start: This sheet consists of all the tasks to do before the actual EVA can start: check various systems readings. As time is precious during an EVA, this procedure has been optimized so the two pairs of EVA participants can complete it in the shortest time possible.
  • End: At the end of the EVA, some checks are necessary about the vehicles used during the activity. THE sheet also aims to prevent EVA participants from forgetting EVA equipment in the vehicles;
  • After: this sheet allows to check everything is back in its place after the EVA.
  • Report: This last sheet gathers all the data needed to fill in the Operations Report.

 

Xavier drew a special attention to get this document through all the crew members so he could make it as understandable, efficient and straightforward as possible. In the future, it aims to be used by every crew member, even the non-Crew Engineer.

 

Tunnel extension building

When we arrived at the MDRS, we noticed the great work that had been done covering the tunnel. The idea was to improve the feeling of immersion in simulation. Still, the tunnel was not hiding the view from the engineering airlock’s doorstep. That is why we decided to intervene.

The day before the beginning of our mission, we assembled some pieces of fence in the form of a wall around the engineering airlock, prolonging the tunnel to the static tank. We covered it with a large plastic sheet and attached it with ropes and metal wire. It was our first teamwork and we were quite efficient, finishing it within a few hours.

The wall held on for a dozen Sols, but finally we had to recover the plastic sheet to prevent the strong wind from tearing it apart. The fence is still in place, materializing the pressurized area.

 

Water consumption monitoring

Since water is maybe the most important resource on Mars, we set a water consumption monitoring study.

On a daily basis, we collected several data to compare their share in the total daily consumption. We noticed that one third of our daily consumption was gone with the flushes (2 gallons per flush) and only 10% dedicated to showers. The other measured water consumptions have been the jugs of filtered water to drink and the water used to fill the Greenhab watering can. We figured out that more than 50% was gone through food rehydration, dish washing and smaller things (teeth and hand washing, coffee and tea).

 

BBC interview

The BBC came to the Hab on Monday 27th February, to complete a documentary regarding missions to Mars. They came in at 9 am, and our guest was already wearing a spacesuit. He spent the day respecting simulation rules. After a briefing, we went on EVA, and we showed him the seismology experiment, did some exploration north of the Hab on the Grey Moon site. After getting back to the Hab, we had lunch together, discussing the mission and Mars exploration.

 

Conclusion

We are glad that we could carry out our science program and all the other tasks that we faced in the station, grateful for the analog environment and protocols that allow us to experiment as much as possible what it would be like on Mars.

This three-week rotation was filled with interesting lessons, and allowed us to know a lot of different aspects of the station and to explore our environment, with different kinds of weather. The crew enjoyed the variety of Martian landscapes we were able to discover. Living and working together was an interesting challenge, and the crew managed to overcome it successfully, despite crewmembers having very different personalities. We were united by our desire for this mission to be a success as a crew. We experienced the need for some rest days after the first two-weeks, which is just one example of the lessons that having three-weeks instead of two have taught us. We are very grateful to the Mars Society and MDRS Mission Support Team for having awarded us this extended rotation, that also allowed us to carry out more complex experiments, and feel the results of confinement and isolation a bit better. The crew still thinks that time flew by quite fast!

We would also like to thank Mission Support for their presence, support and reactivity during our mission.

Credit goes to our crowdfunding donors, Colas, the Mars Society, Association Planète Mars (French chapter of the Mars Society), our university ISAE-SUPAERO, the ISAE-SUPAERO Foundation, Staneo, Optinvent, Vegidair, ISAE-SUPAERO Space Systems Laboratory, CNES and VittaSciences, for having supported this mission, making it possible for our crew to join the MDRS 2016-2017 season.

We also thank all the experts that have helped us prepare our various experiments during this mission.

We are hoping that next season will see another crew of Supaero space engineers take part in the MDRS adventure!

Crew Photos – March 2nd

Engineering check seen from the Optnivent glasses

 

Arthur and Mouadh on the crash site

 

Taking off the captor

 

Arthur and Mouadh besides the seismometer

 

Lettuce growing in the Vegidair

Journalist Report – March 2nd

Journalist report, 03/02/17 – Sol 18: Completing tasks.

Today’s EVA had two purposes: find what happened to the atmospheric balloon we lost yesterday, and recover the seismometer, now running for more than two weeks. Xavier was EVA leader, and decided to lead a new human factor experiment, following up on his emergency procedures research: the EVA was conducted without any radio contact, using scuba diving gestures to communicate, and limiting drastically communications. This situation is of course caricatural: a scene in which every member of the team would have a radio failure, is not only very unlikely, but also the scenario where it happens immediately after leaving the airlock and keeps going on during the whole EVA does not exist for the simple reason that real astronauts would just have moved back immediately into the station, aborting the EVA.

The point was here to exaggerate the problem, in order to test the worst-case scenario, at every stage of the EVA. In this kind of situation, having had a strong briefing before going out is essential, to minimise the need of communications afterwards. It is also crucial to always watch his teammates, not to let somebody alone, or to lose visual contact. This is why moving in the vehicles also required frequent stops, to check if everybody was following, a thing we usually do by radio. The engineering check was done assuming that the crew received today’s habcom, Victoria, but only her, in order not to forget something. Louis, staying in the hab also could remotely monitor what Arthur was seeing, from his Optinvent glasses.

After having completed every task they were asked for by Victoria; Xavier, Arthur and Mouâdh first went North by foot to check the balloon site. They only found the rope and its attach, supposed to be inside the balloon platform. This is how it failed: the connection between these two piece must have been too weak to endure the wind force. The irony is that the camera we removed yesterday was precisely in this gap, so that without removing it, we might have preserved both of it. But I’m not sure that Xavier, the video camera owner would have liked to give it another try… To end with the EVA, my three colleagues had no trouble removing the seismometer from its hole. They came back early, after one hour outside.

The afternoon was quiet, as everybody was working on his final reports or productions. Tomorrow is (already ?) our last day in simulation, so that we were all focusing on trying to end our work properly. It is strange to realise how short the simulation seems to have been, whereas we are already feeling at home in this little hab already. It surely will be strange to leave on Saturday to go back to reality.

 

Louis MANGIN, crew journalist MDRS 175

Commander Report – March 2nd

Dear Earth,


There is no such thing as silence.

Sometimes it is good to take a break from all the noise inside the
Hab: we are constantly surrounded by the deep hum of the diesel
generator, the regular drop hammer of the water pump, the proverbial
quarrelling of the card game (“why on earth did you throw away that
ace of spades?!”), the occasional scratch of the walkie talkies, the
hunger-triggering rotation of the bread machine…
That might partly explain why Xavier wanted to perform Sol 18’s EVA
with the radios turned off. Other explanation: it allowed him to take
notes on how natural is the set of gestures we established, based on
scuba diving. The EVA had three main objectives: first, I tested the
newly-implemented vocal recorder of the AR glasses during the
engineering check, given that we could not transmit the measurements
to the Hab.

Then, Xavier took the lead to investigate the area where the balloon
was last seen. Still silently, Mouâdh, Xavier and I recovered the
anchor and the rope that had visibly been violently pulled out of the
balloon’s platform. No more evidence have been found on the balloon’s
destiny, but it is likely to have fallen down at night when the air
inside could no longer be heated by the sun. Given the wind direction
yesterday, it must have gone south of our settlement, many miles away.

The final task we performed was to recover the seismometer before the
end of the mission. The briefing we did yesterday was precise enough
to allow us to pack everything silently and go back to the Hab with an
ATV and a rover. In the end, it appears that we were perfectly able to
communicate instructions with gestures only, if we were correctly
prepared. Normally in such a situation with all the radios off, the
safest decision would be to abort the EVA and go back to the Hab, but
it seemed important to test it and improve our protocols.

At noon we figured out that we had just enough dehydrated eggs left to
mix them with flour, sugar and milk, following the traditional French
recipe of crêpes. The psychological effect was overwhelmingly
positive, in these times of end-of-mission food shortage.

The afternoon was very calm, everyone working on his part of the
Mission Summary Report, listing the results of our experiments and
repairs. It seems that we have been very inspired: now we have to cut
half of the text to meet the format required!


Ad Astra!
Arthur Lillo
Commander of the silent Crew 175

GreenHab Report – March 2nd

Green Hab Report  – Sol 18
Report written by: Victoria DA-POIAN (Crew Biologist)

Date : 03/02/2017

Functionality: The heater in the green hab is working well. Today was a very sunny day. I checked the temperature in the GreenHab this morning. It was around 35 Celsius degrees around 10:15 AM while the temperature in the tunnel was around 7.6 Celsius degrees. I switched on the cooler (on stage 2).

The GreenHab temperature was 19 Celsius degrees at 6:00PM while it was 8 Celsius degrees in the tunnel. I watered the seedlings this morning and I did this afternoon.


Status: The existing seedlings in the greenhab are continuing to grow well. There are spinach, lettuce, radish, and beans growing very well in the small pots. I planted a new lettuce today.

The Vegidair is functionning well. The pump is working well (it was making strong noise in the morning, so I added water). The day/night cycle seems to have some issues, we wll investigate that.
Unfortunately, there will not be a new crew to take over after us so I am worried about this.

Science Report – March 2nd

Science Report

Sol 18

Experiment: Optinvent AR Glasses
Person filling in the Report: Louis Maller

Today the glasses were taken on a non-verbal EVA, worn by Arthur Lillo. They were connected to my computer in the Hab by LAN, so I could access to the glasses camera, and the files inside the glasses.

Today’s EVA was to be done without any radio comm from and between the EVA buddies (they could only receive instructions from the Hab). So the glasses were quite useful as they allowed to monitor their activities, see what they were doing.

A screenshot of the image was used to get to know the level of water inside the tank.

Head movement detection was used to record a certain amount of information using the voice record function. I was able to access the files from inside the hab as soon as they had been recorded (or as soon as the glasses were back in range), so that way we had information of the level of the two trailer tanks, gasoline tank, propane, and state of Deimos with only a slight lag.

When the crew went to check propane, the signal was lost. When they came back, we instructed the glasses’ bearer to nod in order to relaunch AirDroid. It worked, so I regained signal and was able to access to the data that had been stored.

From inside the hab it was quite a success.

I could see on the camera that Arthur was frequently using his glove in front of his face, in order to better see the screen of the glasses, so the visibility of the notifications is still an issue. Arthur told me that indeed it would have been nice to have a continuous signal on the screen indicating that the recording is ongoing.
There are a few instances when the recording ran to its maximum time (5:17).

The movements necessary to launch these actions are also new to him, so sometimes I think he moved maybe with too much or too little amplitude, and of course being in the helmet and wearing the backpack make some of these movements difficult. His feedback is that the movements should be easier to do inside the helmet. The difficulty with that is that the movement should not be so easy to do that they would be done accidently all the time. I think also what lacked is training to properly do the movements in an efficient way.

The glasses are connected to a portable battery charger, so they should not run out of charge at all during the EVA, nor display the battery alert prompter at any time.

They came back near to the hab at around 1000 and I could regain connection with the glasses, see through the camera and download files.
The quality of the recording is all right, even though the reverberation in the helmet can make it hard to understand, and it is worse when there is wind.

Experiment: Seismometer
Person filling in the report: Mouadh Bouayad
The seismometer has been recovered today from its place, and the hole it was in filled in. The data was recovered with it and analyzed in the days to come.

Experiment: Solar Balloon
Person filling in the report: Simon Bouriat
The EVA today recovered the balloon’s anchor, and the part of the platform to which it was attached. We can therefore conclude that it detached from the rest of the platform, as the balloon drifted away.

Sol Summary – March 2nd

SOL SUMMARY REPORT SOL 18
SOL: 18

Person filling out Report: Louis MALLER, XO

Summary Title: The Artists

Mission Status: successful silent EVA in the morning, all systems go, work on experiments ongoing

Sol Activity Summary: EVA, science work on different experiments, sport

Look Ahead Plan: Tomorrow we will go for a last EVA, debrief the mission, and prepare to exit the Sim.

Anomalies in work: gave up on the 3D printer, clock in the living quarters not functional

Weather: sunny, no wind

Crew Physical Status: Injured crewmember conditions stable, one crewmember with a slight headache, rest of crew feeling well

EVA: non-verbal EVA for balloon debris recovery, AR glasses tests and seismometer recovery – success

Reports to be filed:
– Commander report
– Operations report
– Journalist report
– GreenHab Report
– EVA #17 report
– EVA #18 request
– Science Report

EVA Report – March 2nd

EVA #17

Crew members (3) : Xavier Rixhon (EVA leader), Mouâdh Bouayad and Arthur Lillo (EVA buddies)

Location: Hab surroundings and South of the Hab (12N 518500, 4250000)

Vehicules : Rover Deimos and ATV 350 #3
Time : departure at 09:00 am and back at 10:02 am

Duration : 1 hour

Purposes:
• Understanding why the balloon flew away shortly after EVA#16
• Searching for balloon crash site and potentially retrieving the platform with the equipment
• Unburying the seismometer from its working place and bringing it back to the Hab
• Even if we take the radio switched ON with us, as soon as the engineering check is completed, we’ll try to complete all these tasks staying silent and using hands motion inspired by scuba diving
• Using AR glasses to record the different data collected during the EVA Engineering Check


Summary:

Before getting through the EVA summary itself, I’d like to say I’m pretty proud of my team. Indeed, we got into the main airlock, to start the depressurisation, right on time : 9:00 am sharp.
As explained in the EVA request, this EVA was one of the kind. As soon as we exited the main airlock after depressurisation, as the current leader, I indicated to my two fellow EVA buddies that the microphone of the radios were down. This marked the starting point of the “radios down” simulation. All along this one hour EVA, no word will have been said. The only way to make us understood by the others will have had to be hands gestures, mainly inspired by scuba diving. As expected, patience and calm would have been the key words of this EVA.
In a safety concern (we never left one man alone behind), we stayed together during the traditional pre-EVA engineering check. Guided by Victoria giving her instructions through the radio earpieces, we went around the Hab to collect the relevant data. As we couldn’t forward them straight away to Victoria, Arthur, wearing the AR glasses, used the voice recording functionality to record the different values and save them in sound files. Meanwhile, inside the Hab, Louis Maller was downloading these files on his personal computer to give the information to Victoria afterwards. Eventually, she could fill in the Engineering Checklist table (for Operations Report purposes). Furthermore, Louis tested the screen shot functionality. For instance, he screen shot what Arthur was seeing during the static tank water level check. This operation was a great success since the engineering check has never attempted this way. On one hand, we didn’t take that much time to complete the check. On the other hand, we took the opportunity to test the AR glasses as never before.
Once we were done with the engineering check, we headed to the site where the balloon had been attached yesterday before flying away. We found the stone anchor built up by EVA#16 team and the loose rope which was keeping the balloon on site. From the anchor, the rope headed South where the balloon maybe flew away. After understanding this, we walked around the anchor site though, hoping to find a torn apart balloon lying on the ground. Unfortunately, after few minutes, we figured out that our little friend was gone once and for all.
Back to the Hab, I gave the leadership to Arthur before he drove the ATV ahead of Mouâdh and I on the Rover Deimos. We headed to the seismometer site (South of the Hab). Once we got there, Arthur gave the leadership to Mouâdh who had already briefed us how to proceed to retrieve the seismometer : Arthur pulled up the battery and I took care of the seismometer while Mouâdh was unplugging the different wires and packing them up in the box with the acquisition system. Then, we put the equipment back in the rover before filling the hole which had been dug at Sol 5. After this task being completed, Mouâdh gave me the leadership back for the ride to the Hab. To end this EVA as it had started, we listened carefully to the final check instructions given by Victoria.
This short EVA was great : not only because we performed the task as expected but mainly because the messages between EVA participants was clear and efficient enough to make us spend only one hour outside to do everything. The rotating leadership worked perfectly and everyone took his role seriously. We came up with creative gestures so no doubts would remain in our communications.
In conclusion, despite the bulky life support system, the fog on the helmet glass and procedure (quite simple though) to follow, we managed to reach our objectives without speaking up at all. In other words, this means that a real radio failure doesn’t specially jeopardise an entire EVA if the participants are well prepared and briefed.

Crew Photos – March 1st


Inflating the balloon 1

Inflating the balloon 2

 


Balloon gaining altitude

 

Crew from above

 


Station from the sky

Station seen from above

Earth is actually going round